Pet treats/Dog chews food Auto Meat Strips Dog Treats Processing Line
제품 상세 정보:
원래 장소: | 지난, 산동 지방 |
브랜드 이름: | DARIN |
인증: | CE ISO9001 |
모델 번호: | DR-126 |
결제 및 배송 조건:
최소 주문 수량: | 1 세트 |
---|---|
가격: | USD |
포장 세부 사항: | 우리는 긴 여행을 위한 수출 표준 나무로 되는 케이스를 및 선적 & 내리는 공급할 수 있었습니다. |
배달 시간: | 첫 지불액을 받기 후에 45 작업 일 |
지불 조건: | T/T, L/C, 서부 동맹, D/A |
공급 능력: | 년 당 50 세트 |
상세 정보 |
|||
재료: | SUS304 | 용법: | 고기 스트립 개는 다룹니다 |
---|---|---|---|
보증: | 1년이요 | 능력: | 시간 당 300~500kg |
힘: | 12kw | 차원: | 14*6*3m |
필요로 하는 노동자: | 2~3명의 노동자 | 원형: | 지난 Darin |
하이 라이트: | dog food production line,pet food processing line |
제품 설명
Dog Food Jerky Treats Making Machine
Product Introduction:
DR-126 meat strip extruding machine can extrude multi pieces of meat sticks. Different sizes and shapes can be made by changing the mold.
1. Especially used to produce high content (max 70-80%) meat products.
2. Patented design to produce meat strips with different shapes and sizes.
3. Stainless steel control cabinet, touch screen with a friendly interface, and fault display function.
4. The screw adopts a detachable structure and has a rust-proof treatment.
Conveyor Part
1. The conveyor is used to transport meat strips. In addition, the cutting device is mounted on this conveyor belt.
2. The conveying speed can be adjusted to meet various speeds.
3. Stainless steel meets food-grade materials, including mesh belts.
4. The upper layer is used to transport materials and cut materials. The lower layer is used to transport the tray.
Technical Parameters
Output | Power | Required Worker | Voltage / Frequency | Dimension |
300-500kg/hr | 12kw | 2~3 | 380V / 50Hz | 15 x 6 x 3m |
Commissioning Service
1. We make accurate factory layout design according to customer’s factory size; if the customer needed, we could make workshop design with electricity power, water supply, gas power, material storage, final storages, worker’s restroom, etc.
2. After delivering machines to the client’s factory, we start to apply for the Visa to client’s country immediately; normally the vessel needs 20-60 days to the required port, so we have enough time to get the Visa. While the machines arrives your factory, our engineers are ready to start for the commissioning service.
3. 1-2 of our engineers will go to your factory to install and adjust the processing line to realize normal production at shortest time.
4. Our engineers have responsibility to train and teach the workers how to operate, clean, maintain and repair all the machines, until the workers could well operate the processing line.
5. It normally costs 10 days for the commissioning
service, and we supply 1 year guarantee from the date of completion of commissioning service.
6. The engineer’s round-trip flight tickets, accommodation and daily salary USD 60 are on client’s account.